Crawley Green Road 2021

CLIENT
Engie Regeneration Limited
 CONTRACT LENGTH
8 months
PROJECT MANAGER
Stuart Waker
PROJECT DESCRIPTION

A complete mechanical and electrical package was carried out here to convert an existing 20 room hotel to sheltered accommodation. Works undertaken included:
- Heating and ventilation 
- Domestic hot and cold water
- Complete electrical install
- Full Paxton access control system
- CCTV
- Fire alarm
- Lightning protection

Share by: